Saturday, February 2, 2008

Flood Preparedness Simulation

(Baca Versi Bahasa Indonesia)

Thursday January 31st 2008, it has been raining heavily for 3 days in Cibubur water gate.Water level in Cipinang Hulu water gate has reached 250 cm. In CBU water has flooded by 50 cm (alert II). By 4 hour it is predicted that situation will changed to alert I. Community was instructed to prepare for flood.
The condition above is the scenario being used for simulation activity taking place in Cipinang Besar Utara.

The next phases are:
Water gate keeper contact Community Protection of CBU, informing that water level has reached 250 cm. Community was asked to prepare for flood. Community Protection contact Head of Lurah. A complete flow of information can be seen in the diagram